THE FOLLOWING ARE MINIMUM SPECIFICATIONS UNLESS SPECIFIED BY OTHERS *
| SOIL
BEARING CAPACITY |
STEMCO
BASEPLATE SIZE (minimum) |
FOOTING
CAPACITY
(unfactored) |
FOOTING
CAPACITY
(unfactored) |
DIMENSION
|
DIMENSION
|
AMOUNT
OF REBAR & SIZE |
REBAR
SPACING IN EACH DIRECTION |
| psf |
(inches) |
(lbs) |
(KN) |
S
(inches) |
H
(inches) |
(inches) |
| 2000 |
4
x 6 |
16000 |
71 |
35 |
10 |
5-10M |
7.5 |
| 4
x 8 |
20000 |
89 |
39 |
10 |
6-10M |
7 |
| 4
x 8 |
25000 |
111 |
44 |
10 |
6-10M |
8 |
| 4
x 8 |
30000 |
133 |
48 |
10 |
7-10M |
7.5 |
| 4
x 8 |
35000 |
156 |
52 |
10 |
7-10M |
8 |
| 6
x 6 |
40000 |
178 |
56 |
11 |
8-10M |
7.5 |
| 6
x 6 |
50000 |
222 |
63 |
12 |
10-10M |
6.5 |
| 6
x 6 |
60000 |
267 |
69 |
13 |
12-10M |
6 |
| 6
x 6 |
70000 |
311 |
74 |
13 |
14-10M |
5.5 |
| 3000 |
4
x 6 |
16000 |
71 |
28 |
10 |
4-10M |
8 |
| 4
x 8 |
20000 |
89 |
32 |
10 |
5-10M |
7 |
| 4
x 8 |
25000 |
111 |
35 |
10 |
5-10M |
7.5 |
| 4
x 8 |
30000 |
133 |
39 |
10 |
5-10M |
8.5 |
| 4
x 8 |
35000 |
156 |
42 |
10 |
6-10M |
7.5 |
| 6
x 6 |
40000 |
178 |
45 |
11 |
7-10M |
7 |
| 6
x 6 |
50000 |
222 |
50 |
12 |
8-10M |
6.5 |
| 6
x 6 |
60000 |
267 |
55 |
13 |
10-10M |
5.5 |
| 6
x 6 |
70000 |
311 |
60 |
13 |
10-10M |
6 |
FOOTING NOTES:
-
Concrete strength shall be a
minimum of 20 Mpa (3000 psi) at 28 days.
-
Concrete shall be Type 10 or
Type 50 with a max 20 mm (3/4") aggregate and 3" slump.
-
Rebar shall be grade 400.
-
Rebar is to be tied at all
intersections.
-
Column shall be placed in the
center of the footing. Eccentric loading reduces the footing capacity.
STEMCO Column Assembly
-
Support and brace the beam in
its intended postion using lumber.
-
Measure the distance from the
top of footing to the underside of the beam and write down this number.
-
IMPORTANT Position the
threaded rod in the support head at the midpoint of its extension to allow for
future up or down adjustment.
-
Measure the length of your
original column from the bottom of the baseplate to the top of the head/top
plate assembly.
-
Subtract Step 2 and Step 4
measurements and record number.
-
Remove head and trim top of
column by the value calculated in Step 5 using an approved metal cutting
blade. The cut must be level, true and free of nicks or burrs.
-
Centre the assembled column
under the beam and centre on the footing. Plumb column in both directions.
-
Drill 3/16" x 2.5" holes
into the
wood beam through holes in the top plate and
install 1/4" x 3" lag bolts.
- Column bases shall be encased by a floor slab or equivalently secured
as specified by others.
NOTE: As required by C.S.A. 086, and TrusJoist,
all beams shall have adequate attachment and positioning of lateral bracing to achieve member stability (as
determined by the building designer). |